Pipeline Progression
Current: IN PROGRESS
Contract Total
$15,000.00
Includes all materials & installation
50% Deposit
$7,500.00
Paid via Stripe (Sep 22)
System Capacity
84W
Transformer: 150W Multi-Tap
Client Concierge
(949) 555-9988
test@newportresidence.com
CAD Lighting Blueprint
84W Total Load
•
150W Transformer
Edit Layout
5x Cast Brass Up-Light
4x Architectural Path Light
2x Wide Wall Wash Light
Field Crew Checklist
Electrical
Job Field Photos
rough in
Trench depth verified at 7 inches
Audit & Project Timeline
Client signed and paid deposit of $7,425.00 via Stripe
Sep 22, 2026 • 9:17 PM